Huracan: A skillful end-to-end data-driven system for ensemble data assimilation and weather prediction
read the original abstract
Over the past few years, machine learning-based data-driven weather prediction has been transforming operational weather forecasting by providing more accurate forecasts while using a mere fraction of computing power compared to traditional numerical weather prediction (NWP). However, those models still rely on initial conditions from NWP, putting an upper limit on their forecast abilities. A few end-to-end systems have since been proposed, but they have yet to match the forecast skill of state-of-the-art NWP competitors. In this work, we propose Huracan, an observation-driven weather forecasting system which combines an ensemble data assimilation model with a forecast model to produce highly accurate forecasts relying only on observations as inputs. Huracan is not only the first to provide ensemble initial conditions and end-to-end ensemble weather forecasts, but also the first end-to-end system to achieve an accuracy comparable with that of ECMWF ENS, the state-of-the-art NWP competitor, despite using a smaller amount of available observation data. Notably, Huracan matches or exceeds the continuous ranked probability score of ECMWF ENS on 80.2% of the variable and lead time combinations. Our work is a major step forward in end-to-end data-driven weather prediction and opens up opportunities for further improving and revolutionizing operational weather forecasting.
This paper has not been read by Pith yet.
Forward citations
Cited by 2 Pith papers
-
AIFS-DOP: End-to-End Medium-Range Weather Prediction from Observations Alone with Machine Learning
An ML model trained only on harmonized gridded observations achieves competitive medium-range weather forecast skill with the IFS for several upper-air and surface headline scores when verified against observations.
-
HealDA: Highlighting the importance of initial errors in end-to-end AI weather forecasts
HealDA supplies ML-based initial conditions for AI weather models that produce forecasts trailing ERA5-initialized runs by less than one day of effective lead time, with the skill gap arising mainly from initial error size.
discussion (0)
Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.