Pith. sign in

REVIEW

The NIF Integrated Timing System - Design and Performance

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv physics/0111046 v1 pith:GLHCGQGF submitted 2001-11-08 physics.ins-det

The NIF Integrated Timing System - Design and Performance

classification physics.ins-det
keywords systemtimingintegratedlaserequipmentfacilityhardwareindependent
verification ladder T0 review T1 audit T2 compute T3 formal T4 reserved
0 comments
read the original abstract

The National Ignition Facility (NIF) will contain the world's most powerful laser. NIF requires more than 1500 precisely timed trigger pulses to control the timing of laser and diagnostic equipment. The Integrated Timing System applies new concepts to generate and deliver triggers at preprogrammed times to equipment throughout the laser and target areas of the facility. Trigger pulses during the last 2 seconds of a shot cycle are required to have a jitter of less than 20 ps (rms) and a wander of less than 100 ps (max). Also, the Timing System allows simultaneous, independent use by multiple clients by partitioning the system hardware into subsets that are controlled via independent software keys. The hardware necessary to implement the Integrated Timing System is commercially available. -- This work is performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under contract No. W-7405-Eng-48.

discussion (0)

Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.