Recognition: unknown
Design and performance of the LHCb trigger and full real-time reconstruction in Run 2 of the LHC
read the original abstract
The LHCb collaboration has redesigned its trigger to enable the full offline detector reconstruction to be performed in real time. Together with the real-time alignment and calibration of the detector, and a software infrastructure to make persistent the high-level physics objects produced during real-time processing, this redesign enabled the widespread deployment of real-time analysis during Run 2. We describe the design of the Run 2 trigger and real-time reconstruction, and present data-driven performance measurements for a representative sample of LHCb's physics programme.
This paper has not been read by Pith yet.
Forward citations
Cited by 2 Pith papers
-
Evidence for the decay $B^0_s\to\phi\eta'$
First evidence for B_s^0 to phi eta-prime decay with relative branching ratio (3.56 ± 0.79 ± 0.18 ± 0.06) x 10^{-2} and absolute branching fraction (0.66 ± 0.15 ± 0.03 ± 0.02) x 10^{-6}.
-
Search for the decays $B_{(s)}^0\to J/\psi\gamma$ at LHCb
Upper limits of 2.9×10^{-6} for B_s^0 and 2.5×10^{-6} for B^0 on the branching fractions to J/ψγ at 90% CL, with the B_s limit improved by a factor of 2.5.
discussion (0)
Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.