Optimization of Project Scheduling Activities in Dynamic CPM and PERT Networks Using Genetic Algorithms

Artificial Intelligence · Submitted 2 Feb 2019

abstract compiled · 2026-09-23 · no language-model review

The authors' main claim Thus, optimum results were obtained in a shorter time than the CPM and PERT techniques by using the model based on the dynamic algorithm.

how it is stated · asserted 1.00 read the record →

Comment (0) Read on arXiv ↗
Cite ▾
arXiv ID1902.00659 (version 1)
Pith ID2CVH3QJY, Pith's permanent record of this paper and its review
CitationMuhammed Hanefi Calp, Muhammet Ali Akcayol. "Optimization of Project Scheduling Activities in Dynamic CPM and PERT Networks Using Genetic Algorithms." arXiv:1902.00659 (2019). https://pith.science/paper/2CVH3QJY
Claim paper

The compiled record

The paper's own sentences, arranged. Each label is drawn from a closed vocabulary; the number beside it is the probability the classifier gave that label. Numbers in the tables are the authors', checked by code. No sentence in this record was written by a model.

Open the compiled record

Compiled by classifier-1.13.0 via TypeSafe API, question bank abstract-p1-20260923, 2026-09-23: 1 request, 7,438 input tokens.

What the abstract itself states, as probabilities: claims first 0.04 · states limitation 0.09 · human participants 0.03 · controlled comparison 0.38 · randomized assignment 0.01 · states quantitative result 0.05 · compares with prior results 0.88 · mentions code or data availability 0.02.

The abstract, sentence by sentence

arXiv listing abstract v1. Results and the main claim are underlined; .

Projects consist of interconnected dimensions such as objective, time, resource and environment. Use of these dimensions in a controlled way and their effective scheduling brings the project success. Project scheduling process includes defining project activities, and estimation of time and resources to be used for the activities. At this point, the project resource-scheduling problems have begun to attract more attention after Program Evaluation and Review Technique (PERT) and Critical Path Method (CPM) are developed one after the other. However, complexity and difficulty of CPM and PERT processes led to the use of these techniques through artificial intelligence methods such as Genetic Algorithm (GA). In this study, an algorithm was proposed and developed, which determines critical path, critical activities and project completion duration by using GA, instead of CPM and PERT techniques used for network analysis within the scope of project management. The purpose of using GA was that these algorithms are an effective method for solution of complex optimization problems. Therefore, correct decisions can be made for implemented project activities by using obtained results. Thus, optimum results were obtained in a shorter time than the CPM and PERT techniques by using the model based on the dynamic algorithm. It is expected that this study will contribute to the performance field (time, speed, low error etc.) of other studies.

background contribution method result interpretation main claim

What the classifier reports for each sentence. The number is the probability it gave the label.
#sentencerolethe authors' own workstates the main conclusionstrength
s0 Projects consist of interconnected dimensions such as objective, time, resource and environment. background 1.00 0.05 0.02 asserted 1.00
s1 Use of these dimensions in a controlled way and their effective scheduling brings the project success. background 1.00 0.05 0.03 asserted 1.00
s2 Project scheduling process includes defining project activities, and estimation of time and resources to be used for the activities. background 1.00 0.05 0.02 asserted 1.00
s3 At this point, the project resource-scheduling problems have begun to attract more attention after Program Evaluation and Review Technique (PERT) and Critical Path Method (CPM) are developed one after the other. background 1.00 0.04 0.03 asserted 0.99
s4 However, complexity and difficulty of CPM and PERT processes led to the use of these techniques through artificial intelligence methods such as Genetic Algorithm (GA). background 0.91 0.06 0.04 asserted 1.00
s5 In this study, an algorithm was proposed and developed, which determines critical path, critical activities and project completion duration by using GA, instead of CPM and PERT techniques used for network analysis within the scope of project management. contribution 0.89 0.93 0.22 asserted 1.00
s6 The purpose of using GA was that these algorithms are an effective method for solution of complex optimization problems. method 0.67 0.24 0.05 asserted 1.00
s7 Therefore, correct decisions can be made for implemented project activities by using obtained results. interpretation 0.98 0.22 0.10 asserted 0.63
s8 Thus, optimum results were obtained in a shorter time than the CPM and PERT techniques by using the model based on the dynamic algorithm. result 1.00 0.88 0.67 asserted 1.00
s9 It is expected that this study will contribute to the performance field (time, speed, low error etc.) of other studies. future work 0.58 0.09 0.11 hedged possibility 0.91

What kind of paper the classifier reports this is: method or tool 1.00 · evidence from simulation or computation 0.80.

What was examined, and what was not

sources read
  • arXiv listing abstract v1
not examined
  • full text
  • figures and tables
  • references and citing sentences
  • relations to other papers
levels run
  • P abstract
not run
  • S sections
  • T body sentences
  • C citations
  • R cross-paper relations

Every quoted sentence on this record is the authors'. Every label is from Pith's closed vocabulary, with the probability shown beside it. Every number in the measurements table is the authors', checked by code. Record as JSON

The paper
Original abstract

Projects consist of interconnected dimensions such as objective, time, resource and environment. Use of these dimensions in a controlled way and their effective scheduling brings the project success. Project scheduling process includes defining project activities, and estimation of time and resources to be used for the activities. At this point, the project resource-scheduling problems have begun to attract more attention after Program Evaluation and Review Technique (PERT) and Critical Path Method (CPM) are developed one after the other. However, complexity and difficulty of CPM and PERT processes led to the use of these techniques through artificial intelligence methods such as Genetic Algorithm (GA). In this study, an algorithm was proposed and developed, which determines critical path, critical activities and project completion duration by using GA, instead of CPM and PERT techniques used for network analysis within the scope of project management. The purpose of using GA was that these algorithms are an effective method for solution of complex optimization problems. Therefore, correct decisions can be made for implemented project activities by using obtained results. Thus, optimum results were obtained in a shorter time than the CPM and PERT techniques by using the model based on the dynamic algorithm. It is expected that this study will contribute to the performance field (time, speed, low error etc.) of other studies.