Pith. sign in

REVIEW 1 cited by

Aerocapture Enabled Fast Uranus Orbiter Missions

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 2310.14514 v1 pith:XHVR5EIL submitted 2023-10-23 astro-ph.EP astro-ph.IMphysics.app-ph

classification astro-ph.EPastro-ph.IMphysics.app-ph
keywords timeaerocaptureflighttrajectoriesuranusfastlaunchyears
verification ladder T0 review T1 audit T2 compute T3 formal

Signed reviews

No signed human review yet.

0 comments
read the original abstract

At the far reaches of the outer Solar System, the ice giants remain the last class of planets yet to be studied using orbiters. The 2023-2032 Planetary Science Decadal Survey has underscored the importance of the ice giants in understanding the origin, formation, and evolution of our Solar System. The enormous heliocentric distance of Uranus presents considerable mission design challenges, the most important being able to reach Uranus within a reasonable time. The present study presents two examples of aerocapture enabled short flight time, fast trajectories for Uranus orbiter missions, and highlights the enormous benefits provided by aerocapture. The first is an EEJU trajectory with a launch opportunity in July 2031 with a flight time of 8 years. The second is an EJU trajectory with a launch opportunity in June 2034 with a flight time of only 5 years. Using the Falcon Heavy Expendable, the available launch capability is 4950 kg and 1400 kg respectively for the two trajectories. Both trajectories have a high arrival speed of 20 km/s, which provides sufficient corridor width for aerocapture. Compared to propulsive insertion architectures which take 13 to 15 years, the fast trajectories offer significant reduction in the flight time.

Discussion (0). Continue with ORCID to comment.

Forward citations

Cited by 1 Pith paper

Reviewed papers in the Pith corpus that reference this work. Sorted by Pith novelty score. Full citation record

  1. High-temperature photovoltaics for solar-electric Oberth maneuvers: ton-class payload feasibility for interstellar-precursor missions

    astro-ph.IM 2026-08 conditional novelty 6.0 of 10

    A 0.3 AU solar-electric Oberth maneuver with 400 C high-temperature solar arrays could carry roughly 1.5 to 3 tonnes to 200 AU in about 25 years on an expendable Falcon Heavy, according to evolutionary trajectory opti...

Pith tools