Pith. sign in

Paper Citation Record · LEDGER

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring

As of 10 August 2026, this Paper Citation Record lists 27 of 27 outbound references and 0 inbound Pith citation observations for arXiv:2601.14558.

A citation records a reference. It does not transfer a finding from one paper to another.

pith.paper-citation-record.v1
2601.14558 v2

Coverage vector

measured 27 of 27 reference resolution

Typed states for the displayed outbound observations.

Source: paper_references, paper_reference_links, observed 2026-08-04T06:23:54.433418Z

measured 27 of 27 standing notices

One-hop event checks from named stored sources.

Source: scholarly_work_events, retraction_status_cache, observed 2026-08-10T06:31:04.303077+00:00

measured 0 of 0 inbound itemization

Pith citing papers itemized under the disclosed page cap.

Source: paper_references, paper_reference_links

measured 0 of 1 external citation measurements

A source-named dated measurement, never combined with another source.

Source: cited_works

Reference resolution

27 of 27 outbound references displayed

  • verified exact0
  • verified fuzzy0
  • unresolved26
  • parse uncertain0
  • malformed identifier1
  • metadata mismatch0

External citation measurements

No source-named external measurement is stored.

Outbound references

Observation aa29e2b9-e4bc-4917-8f5b-17854d485fa9 · outbound

This paper cites an unresolved cited work.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Unresolved cited work

Reference 1

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:51.139631Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:51.139631Z digest=sha256:262e14caf872fa4dff66c86b5d79febd0a55527aad745168b7c30dc0325208ad

Observation 6c0f3c18-499a-41b2-8b30-fd0a7effbaad · outbound

This paper cites The Future of Nuclear Energy in a Carbon -Constrained World,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring The Future of Nuclear Energy in a Carbon -Constrained World,

Reference 2

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:51.231579Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:51.231579Z digest=sha256:18027c2ffa82991c8e7af292f6b815683fcc85e9380361c7d5f34f32ab03fa33

Observation 5408c901-cdbb-4df8-a711-2b60c83a1d84 · outbound

This paper cites Sources of Cost Overrun in Nuclear Power Plant Construction Call for a New Approach to Engineering Design,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Sources of Cost Overrun in Nuclear Power Plant Construction Call for a New Approach to Engineering Design,

Reference 3

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:51.389241Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:51.389241Z digest=sha256:7d7331e634f960a23813d2b0c8e35b2199a9cdf428e95381ffa909aaf1e8615b

Observation fc0f9bf3-cace-4e39-b718-f8ef5f823564 · outbound

This paper cites Phase IX Update (1987) Report for the Energy Economic Data Base Program,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Phase IX Update (1987) Report for the Energy Economic Data Base Program,

Reference 4

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:51.513365Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:51.513365Z digest=sha256:f7f5c75ec1802ccbb419d0dce5e46975709840340d39af68f1ab7067a947f17c

Observation 1e838be3-c733-4258-87b7-c7da83ae9212 · outbound

This paper cites Power Plant Cost Escalation: Nuclear and Coal Capital Costs, Regulation, and Economics,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Power Plant Cost Escalation: Nuclear and Coal Capital Costs, Regulation, and Economics,

Reference 5

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:51.656393Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:51.656393Z digest=sha256:044b150f0ca4f49b940b0b02ec9281ba3320493574912de0b084c498b9b98616

Observation fd766646-8467-4c1d-8804-9fe0759c9776 · outbound

This paper cites An Analysis of Nuclear Power Plant Construction Costs,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring An Analysis of Nuclear Power Plant Construction Costs,

Reference 6

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:51.772277Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:51.772277Z digest=sha256:184a8eadc058ac61096a34c047cdd1d776c89892187262446c0c5f2a70ecc9b9

Observation a0269d4b-2ed1-423a-9ba3-64ba0768c51c · outbound

This paper cites Analysis of Nuclear Power Construction Costs,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Analysis of Nuclear Power Construction Costs,

Reference 7

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:51.909785Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:51.909785Z digest=sha256:4750ad7e9728e71f148bcb812982bcd9946b90d40fd925c9193c2b6337d6c783

Observation 6d207660-2d82-4683-b6cf-6e5dcab3436a · outbound

This paper cites The Successful Delivery of Megaprojects: A Novel Research Method,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring The Successful Delivery of Megaprojects: A Novel Research Method,

Reference 8

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:52.037097Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:52.037097Z digest=sha256:69f1d41008676177753f09df59de7347f87a257913143a6167945c02002842f6

Observation 1d28fefd-476f-4852-a2eb-3ecabde78c69 · outbound

This paper cites Why are Megaprojects, Including Nuclear Power Plants, Delivered Overbudget and Late? Reasons and Remedies,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Why are Megaprojects, Including Nuclear Power Plants, Delivered Overbudget and Late? Reasons and Remedies,

Reference 9

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:52.078013Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:52.078013Z digest=sha256:a1998d29fe87a98a04c82c4d238d6cb23eb267be2ef22ee386dbd16c3f86ce69

Observation 1cd65838-db1c-445b-9122-7d74d18e990a · outbound

This paper cites Quantifying Capital Cost Reduction Pathways for Advanced Nuclear Reactors,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Quantifying Capital Cost Reduction Pathways for Advanced Nuclear Reactors,

Reference 10

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:52.192038Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:52.192038Z digest=sha256:d3271aea084b733e9dbb6db7b143386611f14c7d7132eb8186a1ad7fead69347

Observation cd18919d-6262-4143-aa7c-e8fe0e780b10 · outbound

This paper cites Potential Cost Reduction in New Nuclear Deployments Based on Recent AP1000 Experience,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Potential Cost Reduction in New Nuclear Deployments Based on Recent AP1000 Experience,

Reference 11

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:52.308771Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:52.308771Z digest=sha256:d574a465f56aaa4caf87ea28114f5c71c5886ed1670b43fbe611329712da9d03

Observation e85e2cdd-d05e-43a1-a6fd-fb8be9ddfa9f · outbound

This paper cites Capital cost estimation for advanced nuclear power plants,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Capital cost estimation for advanced nuclear power plants,

Reference 12

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:52.438629Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:52.438629Z digest=sha256:3ffa46ab64cfc4b6afd17f7ba2e37e037dbe9c93a7cc2a31619cd6b59568fa9e

Observation 86c847a3-be97-416b-80f7-4f4c53263d64 · outbound

This paper cites Construction schedule and cost risk for large and small light water reactors,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Construction schedule and cost risk for large and small light water reactors,

Reference 13

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:52.563242Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:52.563242Z digest=sha256:2cef3a694566ba1bb7c1be30a301b85936ac95f48809e638ff70f6e9b4a3f966

Observation 4e8e1656-e038-473a-a5d4-3cd185801573 · outbound

This paper cites Why Does Nuclear Power Plant Construction Cost So Much?,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Why Does Nuclear Power Plant Construction Cost So Much?,

Reference 14

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:52.717866Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:52.717866Z digest=sha256:c07c7f42b790401e0cd27cbf8a43ebb3842cf007d2a33382069e5846062f80e0

Observation 82b4de8f-b892-407b-b218-94bdabcd66ff · outbound

This paper cites Will Claims By Contractors on Big Design -Build Projects Ever End?,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Will Claims By Contractors on Big Design -Build Projects Ever End?,

Reference 15

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:52.851262Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:52.851262Z digest=sha256:7aa2aeeb49663c28d4188a1d9a7096d197395aea9f14b67acce8d6dbe3f127ff

Observation 3b8edb5c-fbb1-4e48-b8f2-32b4d59f5318 · outbound

This paper cites Plant Vogtle's contractors sue Georgia Power, project's co -owners,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Plant Vogtle's contractors sue Georgia Power, project's co -owners,

Reference 16

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:52.962468Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:52.962468Z digest=sha256:eb43342cc71a4798494ae5e530c01ae052d13e288c80ea855e802beeb6063ecb

Observation c7c1131d-7fb7-48cb-97f5-38e0d5386bbe · outbound

This paper cites V.C. Summer Nuclear Generating Station Units 2 & 3 Project Assessment Report,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring V.C. Summer Nuclear Generating Station Units 2 & 3 Project Assessment Report,

Reference 17

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:53.012024Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:53.012024Z digest=sha256:df66b69380b9ec515e50b6234ba01fafd787633b776847106af95cd32cae5a49

Observation e7ab985c-ff04-40a4-9666-a563e85f0021 · outbound

This paper cites Exhibit (K_P -2): Bechtel Report Issues as Discussed in Prior Quarterly Reports and Testimony and in Correspondence From and With ORS,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Exhibit (K_P -2): Bechtel Report Issues as Discussed in Prior Quarterly Reports and Testimony and in Correspondence From and With ORS,

Reference 18

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:53.108168Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:53.108168Z digest=sha256:7ea844ad21aec5bf2a21da609aa5f464d3f3b2b31283d6ed04aea8d922574007

Observation 5495007f-2be6-4d4a-865c-0fa1f0fca079 · outbound

This paper cites Schedule-Based Construction Incentives,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Schedule-Based Construction Incentives,

Reference 19

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:53.250953Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:53.250953Z digest=sha256:5b3b817a1678b3c00ab3da088b9460c31d1d4d65239fdf82b8f934591648abd2

Observation a0f47a9e-ac0d-4969-b316-0ee74e948bf6 · outbound

This paper cites Flyvbjerg and D.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Flyvbjerg and D

Reference 20

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:53.407888Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:53.407888Z digest=sha256:55e58cef31b035c90fb95ce95be16754d2cb8b66b17ea0412e2017cae0a37edc

Observation a48e9fd7-e145-476e-9eaa-bf726c6871bf · outbound

This paper cites 2024 Total Cost Projection of Next AP1000,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring 2024 Total Cost Projection of Next AP1000,

Reference 21

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:53.567220Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:53.567220Z digest=sha256:079da3b84cfb9ca542a75c990f015a8264ac269c290fc9abe99b05fa962da89f

Observation a8d213d8-a3df-4f4a-9be7-90c8d76d30b6 · outbound

This paper cites Pathways to Commercial Liftoff: Advanced Nuclear,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Pathways to Commercial Liftoff: Advanced Nuclear,

Reference 22

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:53.713552Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:53.713552Z digest=sha256:db1c02c5751dc82b6457d58e307ff7bcd361617b6f952dadf9cb61581147cf7f

Observation 323cdd4e-ec75-42e9-916c-7fb651bc6d15 · outbound

This paper cites Analysis of GW-Scale Overnight Capital Costs,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Analysis of GW-Scale Overnight Capital Costs,

Reference 23

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:53.914608Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:53.914608Z digest=sha256:8a3ebd8ea4312bb6f67c7f4d73deb22a48360e42744022b79e4806f33fd4f251

Observation 71f913d6-a6ee-4adf-a995-a446be0b2ebc · outbound

This paper cites Laying the Foundation for New and Advanced Nuclear Reactors in the United States,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Laying the Foundation for New and Advanced Nuclear Reactors in the United States,

Reference 24

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:54.102884Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:54.102884Z digest=sha256:018dd1c1b4c192c556e6332425524d0266bfe44d98806bbc7fbd28b987fa84ab

Observation 315b211e-cf3e-470f-996e-e3962773ff1d · outbound

This paper cites A Generalized Nuclear Code of Accounts for Cost Estimation Standardization,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring A Generalized Nuclear Code of Accounts for Cost Estimation Standardization,

Reference 25

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:54.243607Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:54.243607Z digest=sha256:0ca33ca67ddd267c1d41e7fd4f3012775f3dbf2da2f075e64c7ea8657dd6caea

Observation faa7fe4f-3c4a-4327-a174-46251e6f7e88 · outbound

This paper cites Technical Reference Book for the Energy Economic Data Base Program,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Technical Reference Book for the Energy Economic Data Base Program,

Reference 26

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:54.296894Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:54.296894Z digest=sha256:08557e03531993c58c670dc949859d4944f4a3441448cce0995f4a537c9d207c

Observation b6aa8c02-0baf-48c3-afcf-b17d73a11d6c · outbound

This paper cites Major Factors Influencing Craft Productivity in Nuclear Power Plant Construction,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Major Factors Influencing Craft Productivity in Nuclear Power Plant Construction,

Reference 27

Resolution
malformed identifier
no resolver link, observed 2026-08-04T06:23:54.433418Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:54.433418Z digest=sha256:62ab3936bf911bbaaef773fd761441a5e43de12b89a133609090e4b853540a78

Pith citing papers

No inbound Pith citation observations are available.