Pith. sign in

REVIEW

Safety-Critical Control Synthesis for network systems with Control Barrier Functions and Assume-Guarantee Contracts

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 1911.03452 v2 pith:4ORIUA4D submitted 2019-11-07 eess.SY cs.SYmath.OC

Safety-Critical Control Synthesis for network systems with Control Barrier Functions and Assume-Guarantee Contracts

classification eess.SY cs.SYmath.OC
keywords controlnetworkcontractassume-guaranteeinvariantrobustsynthesissystems
verification ladder T0 review T1 audit T2 compute T3 formal T4 reserved
0 comments
read the original abstract

This paper aims at the safety-critical control synthesis of network systems such that the satisfaction of the safety constraints can be guaranteed. To handle the large state dimension of such systems, an assume-guarantee contract is used to break the large synthesis problem into smaller subproblems. Parameterized signal temporal logic (pSTL) is used to formally describe the behaviors of the subsystems, which we use as the template for the contract. We show that robust control invariant sets (RCIs) for the subsystems can be composed to form a robust control invariant set for the whole network system under a valid assume-guarantee contract. An epigraph algorithm is proposed to solve for a contract that is valid, ---an approach that has linear complexity for sparse networks, which leads to a robust control invariant set for the whole network system. Implemented with control barrier function (CBF), the state of each subsystem is guaranteed to stay within the safe set. Furthermore, we propose a contingency tube Model Predictive Control approach based on the RCI, which is capable of handling severe contingencies, including topology changes of the network. A power grid example is used to demonstrate the proposed method. The simulation result includes both set point control and contingency recovery, and the safety constraint is always satisfied.

discussion (0)

Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.