Pith. sign in

REVIEW

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 0904.1183 v1 pith:4YHXRWXB submitted 2009-04-07 astro-ph.IM

Thirty Meter Telescope Site Testing I: Overview

classification astro-ph.IM
keywords sitetestingfivesitesarmazonescandidatesmaunameter
verification ladder T0 review T1 audit T2 compute T3 formal T4 reserved
0 comments
read the original abstract

As part of the conceptual and preliminary design processes of the Thirty Meter Telescope (TMT), the TMT site testing team has spent the last five years measuring the atmospheric properties of five candidate mountains in North and South America with an unprecedented array of instrumentation. The site testing period was preceded by several years of analyses selecting the five candidates, Cerros Tolar, Armazones and Tolonchar in northern Chile; San Pedro Martir in Baja California, Mexico and the 13 North (13N) site on Mauna Kea, Hawaii. Site testing was concluded by the selection of two remaining sites for further consideration, Armazones and Mauna Kea 13N. It showed that all five candidates are excellent sites for an extremely large astronomical observatory and that none of the sites stands out as the obvious and only logical choice based on its combined properties. This is the first article in a series discussing the TMT site testing project.

discussion (0)

Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.