Pith. sign in

REVIEW

Wide-Field InfraRed Survey Telescope (WFIRST) Interim Report

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 1108.1374 v1 pith:AWSAPP7K submitted 2011-08-05 astro-ph.IM

Wide-Field InfraRed Survey Telescope (WFIRST) Interim Report

classification astro-ph.IM
keywords wfirstsurveyinterimmissionofficetelescopeastrochartered
verification ladder T0 review T1 audit T2 compute T3 formal T4 reserved
0 comments
read the original abstract

In December 2010, NASA created a Science Definition Team (SDT) for WFIRST, the Wide Field Infra-Red Survey Telescope, recommended by the Astro 2010 Decadal Survey as the highest priority for a large space mission. The SDT was chartered to work with the WFIRST Project Office at GSFC and the Program Office at JPL to produce a Design Reference Mission (DRM) for WFIRST. This paper describes an Interim DRM. The DRM will be completed in 2012.

discussion (0)

Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.