Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring

As of 10 August 2026, this Paper Citation Record lists 27 of 27 outbound references and 0 inbound Pith citation observations for arXiv:2601.14558.

A citation records a reference. It does not transfer a finding from one paper to another.

pith.paper-citation-record.v1
2601.14558 v2

Coverage vector

measured 27 of 27 reference resolution

Typed states for the displayed outbound observations.

Source: paper_references, paper_reference_links, observed 2026-08-04T06:23:54.433418Z

measured 27 of 27 standing notices

One-hop event checks from named stored sources.

Source: scholarly_work_events, retraction_status_cache, observed 2026-08-10T06:31:04.303077+00:00

measured 0 of 0 inbound itemization

Pith citing papers itemized under the disclosed page cap.

Source: paper_references, paper_reference_links

measured 0 of 1 external citation measurements

A source-named dated measurement, never combined with another source.

Source: cited_works

Reference resolution

27 of 27 outbound references displayed

  • verified exact0
  • verified fuzzy0
  • unresolved26
  • parse uncertain0
  • malformed identifier1
  • metadata mismatch0

External citation measurements

No source-named external measurement is stored.

Outbound references

Observation aa29e2b9-e4bc-4917-8f5b-17854d485fa9 · outbound

This paper cites an unresolved cited work.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Unresolved cited work

Reference 1

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:51.139631Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:51.139631Z digest=sha256:81770fa0d8aa10a5ba41f9596fdbdc37a38c17b04e89bff0fe888f556f84e4a5

Observation 6c0f3c18-499a-41b2-8b30-fd0a7effbaad · outbound

This paper cites The Future of Nuclear Energy in a Carbon -Constrained World,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring The Future of Nuclear Energy in a Carbon -Constrained World,

Reference 2

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:51.231579Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:51.231579Z digest=sha256:7862c2686447e9bf6bcc8f6a8c44a1f23fecc5e6f2fa45680cf168edede44098

Observation 5408c901-cdbb-4df8-a711-2b60c83a1d84 · outbound

This paper cites Sources of Cost Overrun in Nuclear Power Plant Construction Call for a New Approach to Engineering Design,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Sources of Cost Overrun in Nuclear Power Plant Construction Call for a New Approach to Engineering Design,

Reference 3

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:51.389241Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:51.389241Z digest=sha256:f034e07231f303a4f0e8851a2078be10758964c701875f4f3abd02d96f04bf13

Observation fc0f9bf3-cace-4e39-b718-f8ef5f823564 · outbound

This paper cites Phase IX Update (1987) Report for the Energy Economic Data Base Program,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Phase IX Update (1987) Report for the Energy Economic Data Base Program,

Reference 4

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:51.513365Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:51.513365Z digest=sha256:ee8af37726a183344fc9cc21225f79d0238a62f1bc2938ad8c83e515b0699c19

Observation 1e838be3-c733-4258-87b7-c7da83ae9212 · outbound

This paper cites Power Plant Cost Escalation: Nuclear and Coal Capital Costs, Regulation, and Economics,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Power Plant Cost Escalation: Nuclear and Coal Capital Costs, Regulation, and Economics,

Reference 5

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:51.656393Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:51.656393Z digest=sha256:eeaf48f08a1544b58b8d4103c7465522c879740930cd3bc857a897caa95e1134

Observation fd766646-8467-4c1d-8804-9fe0759c9776 · outbound

This paper cites An Analysis of Nuclear Power Plant Construction Costs,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring An Analysis of Nuclear Power Plant Construction Costs,

Reference 6

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:51.772277Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:51.772277Z digest=sha256:b5c2700d4b233ba457fb3f27dc14dcea91bcec60ce6dc706bb4b2ad40eabb01c

Observation a0269d4b-2ed1-423a-9ba3-64ba0768c51c · outbound

This paper cites Analysis of Nuclear Power Construction Costs,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Analysis of Nuclear Power Construction Costs,

Reference 7

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:51.909785Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:51.909785Z digest=sha256:37570fe352ea5f80f7f1031e1cadf5511942165583f1fefd7f801bb268270979

Observation 6d207660-2d82-4683-b6cf-6e5dcab3436a · outbound

This paper cites The Successful Delivery of Megaprojects: A Novel Research Method,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring The Successful Delivery of Megaprojects: A Novel Research Method,

Reference 8

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:52.037097Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:52.037097Z digest=sha256:8f1bbbc67728ac93a60673343424db6184f50ab0b9e43ab12b283b64a882d6b5

Observation 1d28fefd-476f-4852-a2eb-3ecabde78c69 · outbound

This paper cites Why are Megaprojects, Including Nuclear Power Plants, Delivered Overbudget and Late? Reasons and Remedies,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Why are Megaprojects, Including Nuclear Power Plants, Delivered Overbudget and Late? Reasons and Remedies,

Reference 9

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:52.078013Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:52.078013Z digest=sha256:9db39eed4dfbf4b4b7ecd54c977690d319f24d68d8a70b8c830d9f89f1a375f7

Observation 1cd65838-db1c-445b-9122-7d74d18e990a · outbound

This paper cites Quantifying Capital Cost Reduction Pathways for Advanced Nuclear Reactors,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Quantifying Capital Cost Reduction Pathways for Advanced Nuclear Reactors,

Reference 10

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:52.192038Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:52.192038Z digest=sha256:913c8abd0a030b65e48c2275372592ef4cc9f90b9ae786bc1a66247ff07fc07e

Observation cd18919d-6262-4143-aa7c-e8fe0e780b10 · outbound

This paper cites Potential Cost Reduction in New Nuclear Deployments Based on Recent AP1000 Experience,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Potential Cost Reduction in New Nuclear Deployments Based on Recent AP1000 Experience,

Reference 11

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:52.308771Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:52.308771Z digest=sha256:fe27d00b570fc6e62b54c38927f27fbf1799c669bade007dc3f5b0a0e47259b8

Observation e85e2cdd-d05e-43a1-a6fd-fb8be9ddfa9f · outbound

This paper cites Capital cost estimation for advanced nuclear power plants,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Capital cost estimation for advanced nuclear power plants,

Reference 12

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:52.438629Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:52.438629Z digest=sha256:8fcf6341059a4227495a54dcc0d6c74b72d4c48b4198bc0c9946c019bb32ebf9

Observation 86c847a3-be97-416b-80f7-4f4c53263d64 · outbound

This paper cites Construction schedule and cost risk for large and small light water reactors,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Construction schedule and cost risk for large and small light water reactors,

Reference 13

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:52.563242Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:52.563242Z digest=sha256:1db8a85a79b01510e4984920c00f51209f2b85e6685d976556e117b5916299f1

Observation 4e8e1656-e038-473a-a5d4-3cd185801573 · outbound

This paper cites Why Does Nuclear Power Plant Construction Cost So Much?,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Why Does Nuclear Power Plant Construction Cost So Much?,

Reference 14

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:52.717866Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:52.717866Z digest=sha256:e429bc70056aa6c807c0054d8c910079f17403e3b63c632d89506f0778e0ea38

Observation 82b4de8f-b892-407b-b218-94bdabcd66ff · outbound

This paper cites Will Claims By Contractors on Big Design -Build Projects Ever End?,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Will Claims By Contractors on Big Design -Build Projects Ever End?,

Reference 15

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:52.851262Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:52.851262Z digest=sha256:649527f70fb28ae372987a6b0b2ab1aa6b3c64afaa29fa30e74175c9155be457

Observation 3b8edb5c-fbb1-4e48-b8f2-32b4d59f5318 · outbound

This paper cites Plant Vogtle's contractors sue Georgia Power, project's co -owners,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Plant Vogtle's contractors sue Georgia Power, project's co -owners,

Reference 16

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:52.962468Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:52.962468Z digest=sha256:fb6f32bf91f507867172a1c46fcb0165e9b4ac161d3e3957fc194bb0375eec1d

Observation c7c1131d-7fb7-48cb-97f5-38e0d5386bbe · outbound

This paper cites V.C. Summer Nuclear Generating Station Units 2 & 3 Project Assessment Report,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring V.C. Summer Nuclear Generating Station Units 2 & 3 Project Assessment Report,

Reference 17

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:53.012024Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:53.012024Z digest=sha256:1a4a78fc1f86be646684ce559c89dc029970ce8825b9545879608f78c82a03fa

Observation e7ab985c-ff04-40a4-9666-a563e85f0021 · outbound

This paper cites Exhibit (K_P -2): Bechtel Report Issues as Discussed in Prior Quarterly Reports and Testimony and in Correspondence From and With ORS,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Exhibit (K_P -2): Bechtel Report Issues as Discussed in Prior Quarterly Reports and Testimony and in Correspondence From and With ORS,

Reference 18

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:53.108168Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:53.108168Z digest=sha256:157a5f9cd5754f6b95ce3dcb424d61d845aa884a203be37133563dacbfac6214

Observation 5495007f-2be6-4d4a-865c-0fa1f0fca079 · outbound

This paper cites Schedule-Based Construction Incentives,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Schedule-Based Construction Incentives,

Reference 19

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:53.250953Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:53.250953Z digest=sha256:385fcf69c03af3752c561a64d3faef3ab0076d9f5a1fb5bc7c6605dcdf5a7043

Observation a0f47a9e-ac0d-4969-b316-0ee74e948bf6 · outbound

This paper cites Flyvbjerg and D.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Flyvbjerg and D

Reference 20

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:53.407888Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:53.407888Z digest=sha256:7cdc692fab2e736f15ee0e3f90228d217cd8c3e6c09827ccd7ff0b4096233954

Observation a48e9fd7-e145-476e-9eaa-bf726c6871bf · outbound

This paper cites 2024 Total Cost Projection of Next AP1000,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring 2024 Total Cost Projection of Next AP1000,

Reference 21

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:53.567220Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:53.567220Z digest=sha256:6ea7f16229c25e89c9f4685853b52f9be5812bc9f40b3b488af224067c61a9de

Observation a8d213d8-a3df-4f4a-9be7-90c8d76d30b6 · outbound

This paper cites Pathways to Commercial Liftoff: Advanced Nuclear,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Pathways to Commercial Liftoff: Advanced Nuclear,

Reference 22

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:53.713552Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:53.713552Z digest=sha256:f6aa3bd7f65cd7ccce8911e96a09b5a6075410d342134fd066ad0ae7dc4c57b0

Observation 323cdd4e-ec75-42e9-916c-7fb651bc6d15 · outbound

This paper cites Analysis of GW-Scale Overnight Capital Costs,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Analysis of GW-Scale Overnight Capital Costs,

Reference 23

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:53.914608Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:53.914608Z digest=sha256:7f2a9b8ae0b56c4ac8a4ead940a41c67a3c525001505057104813354aac56777

Observation 71f913d6-a6ee-4adf-a995-a446be0b2ebc · outbound

This paper cites Laying the Foundation for New and Advanced Nuclear Reactors in the United States,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Laying the Foundation for New and Advanced Nuclear Reactors in the United States,

Reference 24

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:54.102884Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:54.102884Z digest=sha256:f98d57aa6ef681399d0964bd2391254be30dbf056fbf5adddddb8f8523af4841

Observation 315b211e-cf3e-470f-996e-e3962773ff1d · outbound

This paper cites A Generalized Nuclear Code of Accounts for Cost Estimation Standardization,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring A Generalized Nuclear Code of Accounts for Cost Estimation Standardization,

Reference 25

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:54.243607Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:54.243607Z digest=sha256:ad27693fa8a2627422133efc59c8fc556fe119cb3446f1077b9b1c7873b6faa4

Observation faa7fe4f-3c4a-4327-a174-46251e6f7e88 · outbound

This paper cites Technical Reference Book for the Energy Economic Data Base Program,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Technical Reference Book for the Energy Economic Data Base Program,

Reference 26

Resolution
unresolved
no resolver link, observed 2026-08-04T06:23:54.296894Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:54.296894Z digest=sha256:bbec1c0e33b366d6aefc9ea8dc4652a24c14520fc7e2b5609bb15c181b9a7e9b

Observation b6aa8c02-0baf-48c3-afcf-b17d73a11d6c · outbound

This paper cites Major Factors Influencing Craft Productivity in Nuclear Power Plant Construction,.

Analysis of Stakeholder Involvement in Nuclear Power Plant Cost Overruns and Implications for Contract Structuring Major Factors Influencing Craft Productivity in Nuclear Power Plant Construction,

Reference 27

Resolution
malformed identifier
no resolver link, observed 2026-08-04T06:23:54.433418Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-04T06:23:54.433418Z digest=sha256:3aa3b63100e32a4718c0e4819251b572f395d7449c88ca6b4dab495bab7fac3b

Pith citing papers

No inbound Pith citation observations are available.