GTOC8: Results and Methods of ESA Advanced Concepts Team and JAXA-ISAS
read the original abstract
We consider the interplanetary trajectory design problem posed by the 8th edition of the Global Trajectory Optimization Competition and present the end-to-end strategy developed by the team ACT-ISAS (a collaboration between the European Space Agency's Advanced Concepts Team and JAXA's Institute of Space and Astronautical Science). The resulting interplanetary trajectory won 1st place in the competition, achieving a final mission value of $J=146.33$ [Mkm]. Several new algorithms were developed in this context but have an interest that go beyond the particular problem considered, thus, they are discussed in some detail. These include the Moon-targeting technique, allowing one to target a Moon encounter from a low Earth orbit; the 1-$k$ and 2-$k$ fly-by targeting techniques, enabling one to design resonant fly-bys while ensuring a targeted future formation plane% is acquired at some point after the manoeuvre ; the distributed low-thrust targeting technique, admitting one to control the spacecraft formation plane at 1,000,000 [km]; and the low-thrust optimization technique, permitting one to enforce the formation plane's orientations as path constraints.
This paper has not been read by Pith yet.
discussion (0)
Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.