REVIEW 1 cited by
PIP2-BD: GeV Proton Beam Dump at Fermilab's PIP-II Linac
Not yet reviewed by Pith; the record is open.
This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.
SPECIMEN: schema-true, not a live event
T0 review · schema-true
One-sentence machine reading of the paper's core claim.
pith:XXXXXXXX · record.json · timestamp
PIP2-BD: GeV Proton Beam Dump at Fermilab's PIP-II Linac
read the original abstract
The PIP-II superconducting RF linac is currently under construction at Fermilab and is expected to be completed by the end of 2028. PIP-II is capable of operating in a continuous-wave mode and can concurrently supply 800 MeV protons to a mega-watt, GeV-scale beam dump facility and to LBNF/DUNE. Designs for proton accumulator rings are being studied to bunch the PIP-II protons into the short pulses needed for neutrino and low-mass dark matter experiments. PIP2-BD is a proposed 100-ton LAr scintillation-only experiment, whose detector design is inspired by CENNS-10 and CCM, that would have world-leading sensitivities to BSM physics, including low-mass dark matter produced in the PIP-II proton beam dump.
Forward citations
Cited by 1 Pith paper
-
Prospects for Exploring Non-Standard Neutrino Properties with Argon-Based CEvNS Experiments
Argon CEvNS detectors at stopped-pion sources project sin²θW precision near 1%, neutrino magnetic-moment limits near 10⁻⁹ μB, charge-radius limits near 10⁻³² cm², and vector NSI sensitivity at the 10⁻² level.
discussion (0)
Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.