Pith. sign in

REVIEW 1 cited by

The Sustainability of the Leo Orbit Capacity via Risk-Driven Active Debris Removal

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 2507.16101 v2 pith:ZFLBPMQM submitted 2025-07-21 eess.SY cs.SYphysics.space-ph

The Sustainability of the Leo Orbit Capacity via Risk-Driven Active Debris Removal

classification eess.SY cs.SYphysics.space-ph
keywords riskdebrisremovalactiveanalysisassessmentlong-termorbit
verification ladder T0 review T1 audit T2 compute T3 formal T4 reserved
0 comments
read the original abstract

The growing number of space debris in Low Earth Orbit (LEO) jeopardizes long-term orbital sustainability, requiring efficient risk assessment for active debris removal (ADR) missions. This study presents the development and validation of Filtered Modified MITRI (FMM), an enhanced risk index designed to improve the prioritization of high-criticality debris. Leveraging the MOCAT-MC simulation framework, we conducted a comprehensive performance evaluation and sensitivity analysis to probe the robustness of the FMM formulation. The results demonstrate that while the FMM provides superior identification of high-risk targets for annual removal campaigns, a nuanced performance trade-off exists between risk models depending on the operational removal cadence. The analysis also confirms that physically grounded mass terms are indispensable for practical risk assessment. By providing a validated open source tool and critical insights into the dynamics of risk, this research enhances our ability to select optimal ADR targets and ensure the long-term viability of LEO operations.

discussion (0)

Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.

Forward citations

Cited by 1 Pith paper

Reviewed papers in the Pith corpus that reference this work. Sorted by Pith novelty score.

  1. Beyond the Cube: Overlapping Grid Methods for Debris Collision Risk Assessment

    astro-ph.EP 2026-07 conditional novelty 6.0

    Double Cube recovers boundary-blind conjunctions at O(N) cost and a parameter-free Gaussian pair-distance correction calibrates the cube formula to ~0.08% residual on a controlled benchmark.