Pith. sign in

REVIEW

Hydraulic External Pre-Isolator System for LIGO

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 1309.5685 v2 pith:T7JIGRQZ submitted 2013-09-23 gr-qc astro-ph.IMphysics.ins-det

Hydraulic External Pre-Isolator System for LIGO

classification gr-qc astro-ph.IMphysics.ins-det
keywords ligohepiisolationobservatoryseismicbandscycledisturbance
verification ladder T0 review T1 audit T2 compute T3 formal T4 reserved
0 comments
read the original abstract

The Hydraulic External Pre-Isolator (HEPI) is the first 6 degrees of freedom active seismic isolation system implemented at the Laser Interferometer Gravitational Wave Observatory (LIGO). Implementation was first completed at the LIGO Livingston Observatory (LLO) prior to LIGO's 5th science run, successfully cutting down the disturbance seen by LLO's suspended optics in the two most prominent seismic disturbance bands, the microseism (0.1-0.3Hz) and the anthropogenic (1-3Hz) bands, by a factor of a few to tens. The improvement in seismic isolation contributed directly to LLO's much improved duty cycle of 66.7% and LIGO's triple coincident duty cycle of 53%. We report the design, control scheme, and isolation performance of HEPI at LLO in this paper. Aided with this success, funding for incorporating HEPI into the LIGO Hanford Observatory was approved and installation is currently underway.

discussion (0)

Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.